Disctrict 9 South Central Welcome to MoDOT Contact, Survey, Jobs, News, Site Map
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

November 23, 2009

map WashingtonCrawford PhelpsIronDent Reynolds ShannonCarter TexasPulaski RipleyOregonHowell Statewide Work Zones

  Counties:

 

All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).

Receive FREE email updates

PDF File: Week of November 23, 2009

Return to top

Interstate 44

Crawford County
Interstate 44:
Contractor crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Followingthe concrete repair, drying time is necessary and the lane will remain closed until this process hasoccurred. Motorist are urged to exercise caution when moving through the work zone.
Location: The westbound lanes from exit at Route KK to the exit at Route H near Cuba, MO.

Phelps County
Interstate 44:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the Route V Overhead to the Sugartree Overhead.
Interstate 44:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: SERVICE ROAD - From the intersection of Route T to the end of state maintenance.

Pulaski County
Interstate 44:
Contractor crews will be grading and resurfacing with Superpave.
Location: BUSINESS LOOP - from the intersection of Route H to the intersection of Route Y.

Carter County

Roadway Maintenance

Crawford County

Construction Project

Interstate 44:
Contractor crews will perform concrete replacement work to maintain a smooth pavement surface.

While performing this function, crews and equipment are located directly on the roadway. Following the concrete repair, drying time is necessary and the lane will remain closed until this process has occurred. Motorist are urged to exercise caution when moving through the work zone.
Location: The westbound lanes from exit at Route KK to the exit at Route H near Cuba, MO.
Roadway Maintenance

Route E:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 8 to the end of state maintenance.
Routes EE, and F:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Motorist are urged to watch for mowing equipment near roadway.
Location: From the intersection of Interstate 44 to the intersection of Route 19.

Return to top

Dent County
Roadway Maintenance

Howell County

Roadway Maintenance
Route PP:

MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 63 to the intersection of Route 142.

Return to top

Howell County & Texas County

Roadway Maintenance

Route 60
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following the concrete repair, drying time is necessary and the lane will remain closed until this process has occurred. Motorist are urged to exercise caution when moving through the work zone.
Location: WESTBOUND from the intersection of Route 76 in Howell County to the intersection of
Route AV in Texas County.

Iron County

Roadway Maintenance

Route 21:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route E to the intersection of Route AA.

Iron County &Washington County
Construction Project

Route 21:
Contractor crews will coldmill and lay down shoulder base.
Location: From the intersection of Route N in Iron County to the intersection of Route 8 in
Washington County.

Roadway Maintenance

Route 21:
MoDOT crews will be performing shoulder repair work, which involves removing ruts, low areas and
high spots on the shoulders. While performing this function, crews and equipment are located
directly on or near the roadway. Motorist are urged to exercise caution when moving through the
work zone.
Location: From the intersection of Route 32 in Iron County to the intersection of Route E in
Washington County.

Return to top

Oregon County

Roadway Maintenance

Route 63:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Motorist are urged to watch for mowing equipment near roadway.
Location: From the Howell County line to the Arkansas State line.

Return to top

Phelps County

Roadway Maintenance

Interstate 44:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the Route V Overhead to the Sugartree Overhead.
Interstate 44:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorists are urged to exercise caution when moving past the work zone.
Location: SERVICE ROAD - From the intersection of Route T to the end of state maintenance.
Route 8:
MoDOT crews will be milling bridge. The bridge will have one lane open for approximately 30 days.
While performing this function, crews and equipment are located directly on the roadway. Motorist
are urged to exercise caution when moving through the work zone.
Location: The bridge located over Dry Fork Creek.

Return to top

Phelps County & Texas County

Roadway Maintenance

Route 63:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route W in Phelps County to the intersection of Route P in Texas County.

Pulaski County

Construction Project

Interstate 44:
Contractor crews will be grading and resurfacing with Superpave.
Location: BUSINESS LOOP - from the intersection of Route H to the intersection of Route Y.
Route 17:
Contractor crews will replace 3 bridges at the Gasconade River.
Location: The three bridges located over the Gasconade River.

Pulaski County & Texas County

Roadway Maintenance

Route AW:
MoDOT crews will be performing shoulder repair work, which involves removing ruts, low areas and
high spots on the shoulders. While performing this function, crews and equipment are located
directly on or near the roadway. Motorist are urged to exercise caution when moving through the
work zone.
Location: From intersection of Route 17 in Texas County to the end of Route AW at Fort Leonard
Wood.

Return to top

Reynolds County

Construction Project

Route O:
Contractor crews will do deck replacement over Harrison Branch.
Location: Bridge rehabilition and deck replacement over the Harrison Branch.

Return to top

Ripley County

Roadway Maintenance

Return to top

Shannon County

Roadway Maintenance

Return to top

Texas County

Roadway Maintenance
Route 63:
MoDOT crews will perform drainage work to keep the roadway dry and maintain stability and proper drainage of water from the travel lanes. While performing this function, crews and equipment are located directly on or near the roadway. Motorist are urged to exercise caution when moving past the work zone.

Location: From the intersection of Route P to the intersection of Route B.

Route H:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Elk Creek.

Return to top

Washington County

Construction Project

Route 21:
Contractor crews will be constructing turning lanes.
Location: At the intersection of Route 8 and Route 21.

Roadway Maintenance
Route 8:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route 21 to the intersection of Route Y.
Route 8:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route 21 to the St. Francois County line.

Return to top

 
 
CONTACT CONTACT CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District