|
Statewide Work Zones
Counties:
All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).
Receive FREE email updates
PDF File: Week of November 23, 2009
Return to top
Interstate 44
Crawford County
Interstate 44:
Contractor crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Followingthe concrete repair, drying time is necessary and the lane will remain closed until this process hasoccurred. Motorist are urged to exercise caution when moving through the work zone.
Location: The westbound lanes from exit at Route KK to the exit at Route H near Cuba, MO.
Phelps County
Interstate 44:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the Route V Overhead to the Sugartree Overhead.
Interstate 44:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: SERVICE ROAD - From the intersection of Route T to the end of state maintenance.
Pulaski County
Interstate 44:
Contractor crews will be grading and resurfacing with Superpave.
Location: BUSINESS LOOP - from the intersection of Route H to the intersection of Route Y.
Carter County
Roadway Maintenance
Crawford County
Construction Project
Interstate 44:
Contractor crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following the concrete repair, drying time is necessary and the lane will remain closed until this process has occurred. Motorist are urged to exercise caution when moving through the work zone.
Location: The westbound lanes from exit at Route KK to the exit at Route H near Cuba, MO.
Roadway Maintenance
Route E:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 8 to the end of state maintenance.
Routes EE, and F:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Motorist are urged to watch for mowing equipment near roadway.
Location: From the intersection of Interstate 44 to the intersection of Route 19.
Return to top
Dent County
Roadway Maintenance
Howell County
Roadway Maintenance
Route PP:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route 63 to the intersection of Route 142.
Return to top
Howell County & Texas County
Roadway Maintenance
Route 60
MoDOT crews will perform concrete replacement work to maintain a smooth pavement surface.
While performing this function, crews and equipment are located directly on the roadway. Following the concrete repair, drying time is necessary and the lane will remain closed until this process has occurred. Motorist are urged to exercise caution when moving through the work zone.
Location: WESTBOUND from the intersection of Route 76 in Howell County to the intersection of
Route AV in Texas County.
Iron County
Roadway Maintenance
Route 21:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route E to the intersection of Route AA.
Iron County &Washington County
Construction Project
Route 21:
Contractor crews will coldmill and lay down shoulder base.
Location: From the intersection of Route N in Iron County to the intersection of Route 8 in
Washington County.
Roadway Maintenance
Route 21:
MoDOT crews will be performing shoulder repair work, which involves removing ruts, low areas and
high spots on the shoulders. While performing this function, crews and equipment are located
directly on or near the roadway. Motorist are urged to exercise caution when moving through the
work zone.
Location: From the intersection of Route 32 in Iron County to the intersection of Route E in
Washington County.
Return to top
Oregon County
Roadway Maintenance
Route 63:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Motorist are urged to watch for mowing equipment near roadway.
Location: From the Howell County line to the Arkansas State line.
Return to top
Phelps County
Roadway Maintenance
Interstate 44:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the Route V Overhead to the Sugartree Overhead.
Interstate 44:
MoDOT crews will be patching, which restores rideablility of the roadway surface. While performing this function, crews and equipment are located directly on the roadway. Motorists are urged to exercise caution when moving past the work zone.
Location: SERVICE ROAD - From the intersection of Route T to the end of state maintenance.
Route 8:
MoDOT crews will be milling bridge. The bridge will have one lane open for approximately 30 days.
While performing this function, crews and equipment are located directly on the roadway. Motorist
are urged to exercise caution when moving through the work zone.
Location: The bridge located over Dry Fork Creek.
Return to top
Phelps County & Texas County
Roadway Maintenance
Route 63:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route W in Phelps County to the intersection of Route P in Texas County.
Pulaski County
Construction Project
Interstate 44:
Contractor crews will be grading and resurfacing with Superpave.
Location: BUSINESS LOOP - from the intersection of Route H to the intersection of Route Y.
Route 17:
Contractor crews will replace 3 bridges at the Gasconade River.
Location: The three bridges located over the Gasconade River.
Pulaski County & Texas County
Roadway Maintenance
Route AW:
MoDOT crews will be performing shoulder repair work, which involves removing ruts, low areas and
high spots on the shoulders. While performing this function, crews and equipment are located
directly on or near the roadway. Motorist are urged to exercise caution when moving through the
work zone.
Location: From intersection of Route 17 in Texas County to the end of Route AW at Fort Leonard
Wood.
Return to top
Reynolds County
Construction Project
Route O:
Contractor crews will do deck replacement over Harrison Branch.
Location: Bridge rehabilition and deck replacement over the Harrison Branch.
Return to top
Ripley County
Roadway Maintenance
Return to top
Shannon County
Roadway Maintenance
Return to top
Texas County
Roadway Maintenance
Route 63:
MoDOT crews will perform drainage work to keep the roadway dry and maintain stability and proper drainage of water from the travel lanes. While performing this function, crews and equipment are located directly on or near the roadway. Motorist are urged to exercise caution when moving past the work zone.
Location: From the intersection of Route P to the intersection of Route B.
Route H:
MoDOT crews will do bridge maintenance to improve the section where the road and bridge meet
and prevent deterioration of the bridge deck or structure.
Location: The bridge located over Elk Creek.
Return to top
Washington County
Construction Project
Route 21:
Contractor crews will be constructing turning lanes.
Location: At the intersection of Route 8 and Route 21.
Roadway Maintenance
Route 8:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route 21 to the intersection of Route Y.
Route 8:
MoDOT crews will be mowing, which controls roadside vegetation and improves sight distance.
Location: From the intersection of Route 21 to the St. Francois County line.
Return to top
|